Project Background
The client is a Japanese-owned electroplating factory in Thailand, generating approximately 200 tons of high-salt electroplating wastewater containing heavy metals (nickel, chromium, and copper) daily. To achieve the local environmental protection requirement of "zero emissions," the client introduced MVR (Mechanical Vapor Recompression) evaporation crystallization technology in 2018 for the advanced treatment and resource recovery of the high-salt wastewater after membrane concentration.
Core Process Route: Pretreatment → Membrane Concentration → MVR Forced Circulation Evaporation Crystallization → Centrifugal Separation → Condensate Reuse
Inlet Water Characteristics: TDS approximately 8-12%, containing heavy metals such as Ni²⁺, Cr⁶⁺, and Cu²⁺, pH 2-4, COD 500-800 mg/L
System Capacity: Evaporation rate 8 t/h, 24-hour continuous operation
Outlet Form: Crystallized salt (mixed heavy metal salt) automatically packaged; condensate reused in the production line rinsing process
System Highlights:
Energy Saving and Consumption Reduction: Utilizing MVR technology and steam recycling, energy consumption per ton of water is only 38-45 kWh, saving over 50% more energy than traditional triple-effect evaporation.
Corrosion-Resistant Materials: The heater and separator body are made of 2205 duplex steel + titanium alloy steam... Compressor impeller, resistant to chloride ion corrosion, designed lifespan of 10 years.
Intelligent control: PLC + touch screen fully automatic operation, supports remote monitoring; trained local Thai engineers can independently operate and maintain.
Resource recovery: Crystallized salt moisture content <5%, centrally treated by local hazardous waste center; heavy metal recovery rate >95%, reducing outsourced disposal costs by approximately 40%.
Operational performance (2018-2023 data)
Indicators: Actual results
System operation rate: >95%
Condensate reuse rate: 99.2%
Crystallized salt production: Approximately 2.8~3.2 tons/day, automatic packaging, no manual contact
Operating cost: Approximately 60~70 RMB per ton of water treated (including electricity, chemicals, and labor)
Environmental benefits: Achieves "zero discharge" of wastewater.